POOR ADHESION OF PLASTERING
In this stunning villa in Marke, a part of the ceiling had collapsed. The concrete ceiling surface w
Read more >
Building dryer: water damage
Using a building dryer is essential when your home has fallen prey to water damage. If you fail to do so, the consequences can be serious.
Read more >
Painting after drying
The plastering phase of your project is almost completed. Now is the time for efficient drying of the plasterwork. One address: Buildingdryers.be!
Read more >
Practical tips
With natural drying it is difficult to estimate the length of the drying process, but also with building dryers it is virtually impossible to determine the exact drying time. In general.
Read more >
Odour control
Are you suffering from air pollution in your home or business? Ozone generators allow odour components and other air pollutants to be efficiently decomposed at molecular level.
Read more >
Dust extraction
Construction or renovation and dust go hand in hand. But that does not mean that you or the people on your worksite have to breathe in dust the whole time.
Read more >
Stockroom
Provincialeweg 1
2890 Puurs-Sint-Amands
(Enter in Google Maps)
REGISTERED OFFICE
Houtenmolenstraat 69B
B-9255 Buggenhout
BTW BE0886.987.301
KBC BE57 7370 2003 9435
0476/20.41.56
info@bouwdroger.com