Drying plasterwork Delivered to your site today
Drying plasterwork Free delivery and placement
Drying plasterwork Free moisture measurement
Drying plasterwork Transparent price
When your home or building really needs to be dry
Discover our drying solutions

DRYING PLASTERWORK

A beautiful new build home that is covered with mould shortly after plastering, is not a pretty sight. The use of building dryers brings down the overall humidity so that moulds do not stand a chance. Would you like to know how long it takes to dry your walls and why drying plasterwork with building dryers is a good choice?

Drying plasterwork with building dryers.

Drying plasterwork: how long does it take?

Drying plasterwork with building dryers can be done already 24 hours after installation. To let the plasterwork dry properly, it is best to work with building dryersfans and, where necessary, additional heating. At Building Dryer you do not need to wait long before your walls are dry. When using the right building dryers, the stucco dries at a rate of 1 cm per week. The stucco is normally 2 cm thick, so that the plasterwork takes about two weeks to dry

Note, however, that any rain during the construction may result in the concrete blocks being still saturated with moisture. In that case, the drying time of the plasterwork may takes as many as 4 weeks. Without building dryers, you are totally dependent on the weather and the drying time can take several weeks, resulting in significant delays in your building project.

 

Why dry plasterwork with building dryers?

Building dryers ensure that your walls are dry in no time! At buildingdryers.be, plasterwork is in principle dried with condensation building dryers, because these are very efficient from 7°C. Moreover, they ensure nice drying, preventing cracking due to too fast drying.

Drying plasterwork with fans and additional heating

The building dryers are combined with fans so that the dry air is perfectly distributed across the plasterwork. In this way, nice uniform drying is obtained. Additional heating is only used if the room temperature is too low and the drying time of the stucco becomes critical. The ideal drying temperature is 20 to 25°C, at temperatures less than 20°C, additional heating can provide a solution. 

The ideal drying temperature is 20 to 25°C.

At room temperatures less than 7°C, extra electrical heating is mandatory. At low temperatures, the building moisture does not evaporate fast enough, whereby less water is released from the plasterwork; However, as soon as we raise the room temperature, the building moisture will evaporate faster because more water is released. You could compare it with a bucket of ice and a bowl of boiling water: at very low temperatures, like ice, there will be no evaporation at all, whilst at high temperatures, like boiling water, the moisture will evaporate much more quickly. Drying plasterwork in the winter is often done with additional heating, because warm air can take more moisture than cold air.

Drying plasterwork in the winter is often done with additional heating.

Drying plasterwork with Building Dryer

At Building Dryer you can hire not only building dryers, but also fans and electric heaters. These products can be hired both separately or combined. Do you need one of these products or a combination of them for your building project? Contact us at 0476/20.41.56 or use the contact form. We will be happy to send you a no commitment quote. Would you like to receive a detailed quote and are you in possession of a digital plan of your home? Then email it to Ruben@bouwdroger.com.

References
{{ imagesalt }} {{ imagesalt }} {{ imagesalt }} {{ imagesalt }} {{ imagesalt }}
Thank you for your prompt service! Truly a pleasure to work with you guys for our project. Top!

Hans D.
{{ imagesalt }} {{ imagesalt }} {{ imagesalt }} {{ imagesalt }} {{ imagesalt }}
Very well organized. When in doubt, they call you to find a solution (in our case, there was no finished drain in the basement, which was eventually fixed cleanly). They also come by to solve problems and are very reasonable in terms of compensation. Highly recommended!

Frederick S.
{{ imagesalt }} {{ imagesalt }} {{ imagesalt }} {{ imagesalt }} {{ imagesalt }}
Thanks for the fast delivery, prompt service and very competitive price! Used the construction dryer and accessories for five weeks without any problems.

Steven O.
{{ imagesalt }} {{ imagesalt }} {{ imagesalt }} {{ imagesalt }} {{ imagesalt }}
The two DF200s were with us for one month. The result is definitely very positive! We should have done this much ea

Björn C.
{{ imagesalt }} {{ imagesalt }} {{ imagesalt }} {{ imagesalt }} {{ imagesalt }}
Thank you for your punctual and correct service!

Steven A.
{{ imagesalt }} {{ imagesalt }} {{ imagesalt }} {{ imagesalt }}
Very good service!

Ward L.
{{ imagesalt }} {{ imagesalt }} {{ imagesalt }} {{ imagesalt }} {{ imagesalt }}
We are 200% satisfied with your construction dryer DF800 that we used. Chap installed in early May and 6 weeks later we got to have cork (yes, yes, cork!) installed!!! Chapeau also for the punctuality of delivery, and the efficiency of your staff. That was to be said!

Danny & Katrien
{{ imagesalt }} {{ imagesalt }} {{ imagesalt }} {{ imagesalt }}
The building dryer did its job well and we are very satisfied with the service!

Bart C.
{{ imagesalt }} {{ imagesalt }} {{ imagesalt }} {{ imagesalt }} {{ imagesalt }}
Contacted one Sunday evening at 9pm, answered immediately. On a Sunday evening! The next morning the construction dryer could be delivered. Good material, everything is provided and professional installation. An example!

Gregory M.
{{ imagesalt }} {{ imagesalt }} {{ imagesalt }} {{ imagesalt }} {{ imagesalt }}
Good service and very friendly people. Appointments made are kept perfectly. In short: highly recommended.

David V.
Projects

NEWLY CONSTRUCTED RESTAURANT BROOX
The site at the old military fortification in Puurs was completely renovated, and that nat
Read more >

See our realisations
{{ imagesalt }}
{{ imagesalt }}
{{ imagesalt }}
Discover our tips

Building dryer: water damage
Using a building dryer is essential when your home has fallen prey to water damage. If you fail to do so, the consequences can be serious.
Read more >

Discover all our tips
Discover our tips

Building dryer: fire damage
Using a building dryer is recommended in the event of damage caused by extinguishing water. Not only will the fire itself have caused significant damage to your home.
Read more >

Discover all our tips
Discover our tips

Laying parquet
Your building project is finally coming to an end. Are you planning to install parquet flooring? Then make sure that the screed has fully dried out.
Read more >

Discover all our tips
Discover our tips

Painting after drying
The plastering phase of your project is almost completed. Now is the time for efficient drying of the plasterwork. One address: Buildingdryers.be!
Read more >

Discover all our tips
Discover our tips

How many buildingdryers?
When you have decided to use building dryers to speed up the drying time of your screed or plasterwork, you should ask yourself how many building dryers you will need to ensure optimal drying.
Read more >

Discover all our tips